Editing the Test Shoot:
Showing posts with label Test Shoot. Show all posts
Showing posts with label Test Shoot. Show all posts
Monday, 26 January 2015
Thursday, 22 January 2015
The Test Shoot:
During the Christmas holidays, Issy and I filmed the test shoot. As we had not casted our female protagonist, we asked my sister to be in the test shoot, however she wasn't able to make it, so my mum stood in at the very last minute.
During the Christmas holidays, Issy and I filmed the test shoot. As we had not casted our female protagonist, we asked my sister to be in the test shoot, however she wasn't able to make it, so my mum stood in at the very last minute.
The purpose of our test shoot was to practice using the camera and mastering the angles. It was like a first draft of our film opening; also to communicate our ideas and visions to the final actress/actor's.
We are really pleased we did the test shoot as it acted like a rehearsal and pinpointed the small errors we wouldn't have noticed before filming, like the missing shots which broke the continuity flow.
In post production we were able to notice that we need more powerful artificial lighting, as it got dark outside quickly and cut off the natural light. However, we took turns in holding a phone torch really still to help brighten up the shots.
From completing the test shoot we feel confident and prepared to set up the bedroom scene, as are film is set in the 1920's and the mis-en-scene is crucial. This involved disguising plugs and wires with fur shawls and hiding the radio and lamp under the bed and pillows. We also think we will reduce the filming time because we know where all the shots are and we have previous knowledge from the test shoot.
Whilst filming the test shoot, we changed some of the shot angles, purely because we found alternative, more effective shots, and also some of the frames we drew on the storyboard were incorrect when it came to panning. You can see the comparison shots on the 'emaze' we completed.
Wednesday, 21 January 2015
Test Shoot VS. Storyboard Analysis:
After filming the test shoot a month ago, and recently editing it, Issy and I decided to create an 'emaze' to compare our original frames from the storyboard to the test shoot frames. Our purpose behind this was to see if our visions were correctly drawn and to analyse why we changed some of the shots whilst filming.
Wednesday, 7 January 2015
Test Shoot
On Friday 2nd January, we shot half of the film opening. We are pleased we have done a practice shoot because we will know how to improve when we come to shooting the real thing.
We set up the whole room at 2pm, so we could then start filming at 4pm. We finished filming around 7pm.
Things we noticed and will improve:
-The first half of our shots, you can see its still daylight, however we had to use artificial lighting for the rest of the shots because it was dark outside and we had no natural lighting- meaning when we edited it, it didn't flow as well.
-We have to add in a few extra shots of the character doing her makeup to improve continuity.
-We have to practice the dolly zoom.
-Finally we have decided to split up the long panning shot because it was over 10 seconds and it lacked a fast-paste mood.
We set up the whole room at 2pm, so we could then start filming at 4pm. We finished filming around 7pm.
Things we noticed and will improve:
-The first half of our shots, you can see its still daylight, however we had to use artificial lighting for the rest of the shots because it was dark outside and we had no natural lighting- meaning when we edited it, it didn't flow as well.
-We have to add in a few extra shots of the character doing her makeup to improve continuity.
-We have to practice the dolly zoom.
-Finally we have decided to split up the long panning shot because it was over 10 seconds and it lacked a fast-paste mood.
Subscribe to:
Posts (Atom)
